Heritage & Specialist • Listed Building Conversion

Grindal House
Renovation

Location

St Bees, Cumbria

Completed

2022

Project Type

Listed Building Conversion

Value

£1.2M+

Project Overview

Breathing New Life Into A Grade II Listed Landmark

Grindal House in St Bees, Cumbria, is a distinguished Grade II listed building with deep roots in the local area. Originally built as a four-storey boarding house for the prestigious St Bees School, the property carries real historical weight. When plans were drawn up to transform it into a luxury 20-bedroom aparthotel, William King Construction was appointed as Principal Contractor to lead the full renovation.

From the very beginning, we worked closely with resident architect Martin Cuthall and the client to make sure every decision honoured the building’s age, character and protected status. Choosing the right materials, planning each structural intervention carefully, respecting what was already there – this is the kind of work our team genuinely takes pride in.

The scope of works was significant. It included a full strip-out and structural remediation, 20-metre pile foundations to support a new five-storey lift shaft, the restoration of 46 original sash windows, new internal linings and gypsum metal finishes throughout, full internal and external decoration, and the creation of a new car park and access road. At every stage, we had to satisfy modern building and fire regulations without compromising the character and integrity of a building that deserves to be treated with care.

What stands at the end of this project is a building with a new purpose and a long future ahead of it. The historical elegance is still very much there. It has simply been given the space to shine again.

Project at a Glance

En-suite aparthotel units delivered
0 Bedrooms
Sash windows restroed
0 Windows
Pile depth for new lift shaft
0 m
Locally Sourced Labour
0 %

Project Photography

A selection of images from the Grindal House project, capturing the transformation from historic boarding house to luxury aparthotel.

Competed Exterior - North Elevation
Competed Exterior - North Elevation
Competed Exterior - North Elevation
Competed Exterior - North Elevation

The Challenge

A Sensitive Restoration In A Protected Building

Renovating a Grade II listed building into a modern aparthotel is never straightforward. Grindal House required careful, knowledgeable handling at every stage. Heritage conservation, fire safety compliance and a high-end residential finish all had to be achieved together, within the very real constraints of a protected historic structure.

Preserving the historic character and fabric of the listed building while satisfying current building and fire regulations

Installing 20-metre pile foundations for a new five-storey lift shaft within the existing structure

Restoring 46 original sash windows using period-appropriate techniques and materials

Reconfiguring the internal layout to create 20 individual en-suite apartments without compromising structural integrity

Achieving a high-quality finish across all units within the limitations of a sensitive, heritage-protected building

Coordinating closely with the architect, client and specialist subcontractors across a complex, multi-phase programme

Maintaining full compliance with listed building consent conditions throughout every stage of the works

"William King Construction brought exactly the right combination of craftsmanship and technical knowledge to this project. Their understanding of heritage construction and their ability to work sensitively within a listed building was evident throughout. the standard of finish, from the restored sash windows to the new internal fit-out, genuinely exceeded our expectations."
Martin Cuthall
Resident Architect

How We Delivered It

Our Approach

Our approach to Grindal House came from a belief we hold across all of our heritage work. A building’s history and its future do not have to be in competition. With the right knowledge, the right team and proper preparation, you can protect what matters while creating something that works beautifully for generations to come.

Before a single tool was picked up on site, we spent time genuinely understanding the building. Its construction, its condition, the sensitivities around its listed status and what all of that meant for every element of the works ahead. That groundwork allowed us to plan properly, move through each phase with confidence and avoid the kind of surprises that cost time and money.

Throughout the project we worked in close collaboration with architect Martin Cuthall, bringing together specialist trades and our own experienced team to deliver each element to the standard this building deserved. From complex structural works deep below ground level to the finest surface finishes in every room, the same care and attention went into all of it.

01

Survey & Planning

A thorough structural and heritage assessment shaped everything that followed. We identified risks early, developed detailed solutions and made sure all listed building consent requirements were fully understood before any works began on site.

02

Structural Works

We installed 20-metre pile foundations to carry the new five-storey lift shaft, alongside full structural remediation throughout the building. All of this was carried out with precision to protect the surrounding historic fabric and keep the project on track.

03

Restoration & Fit Out

Forty-six original sash windows were carefully restored using traditional techniques and sympathetic materials. New internal linings, gypsum metal finishes and full decoration were then carried through all 20 en-suite units to deliver a residential finish that meets a genuinely high standard.

04

Handover

External works including the new car park and access road completed the project. The building was handed over fully compliant with building regulations, fire safety requirements and listed building consent conditions, on programme and to the complete satisfaction of the client.

Aparthotel rooms delivered
0 Units
Sash windows restored
0 Windows
Lost-time incidents throughout project
0 LTI
Delivered within agreed contract sum
£ 0 Overspend